Installation
Installation of new Category 6A copper, OM4 multi-mode fibre optic cabling and installation of wireless equipment.
Installed into the room of your choice (ground floor), with all packaging removed
Byond Installation Management
The decommissioning of existing AV equipment (school to dispose of) to allow the installation of a new 75” interactive panel
Avoira Project Coordination & Remote Set Up Support
Teddi The decommissioning of 2no. existing and installation as direct replacements of 2no. new digital signage screens
Stratford Turing Kramer Kit 3/4/5/6 Floors (180625)
Windows 11 Upgrade
Stratford Turing AV Prelims (180629)
Standard Placement & Install Service
De-commission of UPS
Stratford Turing AV Phase 2 (180627)
Teddi AV install removal of existing wall mounted projectors with the old-style interactive whiteboards and installation of 6 x 75" Promethean Interactive Screens.
De-installation and disposal of existing 65" screen and installation of the new one, re-using the existing cables and brackets.
Software Installation on Pc/Notebook
Loading custom system image
Kingcom Installation Of C-touch Interactive Screens & De-installed Of Clevertouch To Include Commissioning And Testing To Network
Teddi 7x i3 Touch X3 75 interactive display install - 6 to be wall mounted and 1 to be mounted onto a rolling stand - City of Wolverhampton College
On-site survey at the three buildings in Northants (Corby) to troubleshoot / validate current Wireless LAN solution, using Heat map survey software.
Standard commissioning of the UPS system by a Riello certified engineer
UltraRead Pre-Labelling Service
Install of 2 x SmartBoard GX165 (interactive 65” touchscreen) at Abbey Primary School, removal of old equipment
2nd Floor Conference Suit AV Solution - 100" commercial displays 10x ceiling speakers 1x custom height adjustable lectern with gooseneck microphone 1x wearable Lavalier Microphone
Avoira Scaffolding Rental
Byond Expenses Covers Parking Congestion ULEZ
AV Presentation solution consisting of 4 x 100 inch commercial displays, 10 x ceiling speakers, 1 x custom height adjustable lectern with gooseneck microphone and 1 x wearable Lavalier Microphone
AV Presentation solution consisting of 4 x100 inch commercial displays,10 x ceiling speakers, 1 x custom height adjustable lectern with gooseneck microphone and 1 x wearable Lavalier Microphone
IMAGING PC
Kingcom Installation of BenQ Interactive Touch Screen Includes De-install Of Exciting Equipment
Delivered assembled to the main access point (ground floor)
Byond Two man Installation team System Provision & Pre Staging Required Drawings - Elevations, Schematics Project Management
KingComs Installation Of C-touch Interactive & De-install Of Excising (Includes Removal Of Old Screen Via C-Touch Once Installed)
Storage Upgrade: Replace HDD for SSD + Copy Operating System - Option to keep original HDD as secondary drive where possible
Avoira Consumables - AV Sundries
Batton Works As Discussed From Site Survey 10.09.25
Display Installation from 76'' to 98'' max weight 85kg (Qty 1)
Kingcom Installation of BenQ Signage Screen in Main Reception Area
Avoira - One Day - Installation & User Familiarisation Training
Install of 1 x SmartBoard GX165 (interactive 65” touchscreen) at Aragon Primary School; 1 x AV Panel to be moved from one room to another (to replace projector)
North West AV - Screen Installation of 65" AP10 Promethean Interactive boards onto floor to wall mount
MTR Project Services - Additional Room Project Delivery for a additional MTR system
Crossways YDYW AV Phase 1 (180631)
Applicable to 5m cable runs only. Longer runs of more than 5m will require extra surface trunking and prices will be amended accordingly due to the extra materials required for job completion
Site survey completed prior to delivery by our specialist delivery subcontractor
Imaging Service for PC/Laptop
Byond London Expenses for screen install
Battery Replacement - Normal working Hours
Install of 11 x SmartBoards GX175 (interactive 75” touchscreen) at Glenthorne High School, removal of old equipment
Avoira DeInstall & Installation 4 x 84" Viewsonic Displays + Project Co-ordinator, Consumables, Disposal
Byond Physical Installation of new Teams Conferencing Solution & Decommissioning of Customers Existing Solution
The provision of AV installations at the following customer site Genting Casinos UK Ltd RWB Centre Management Suite Resorts World Birmingham Pendigo Way Birmingham B40 1PU
North West AV Installation of SMART Screen (Including Any De-Install)
Teddi Removal & Disposal Of Equipment
Installation Of C-touch Interactive Screen To Include De Install
Office Furniture Delivery & Installation
Crossways YDYW AV Phase 2 (180632)
Byond Install System Provision & Pre Staging Drawings Project Management
Eng ing Service ENG-COMPONENT (1-9)
Avoira Pre Staging - No Confirmed Vendor On/Off Site Set Up
King-com Installation of Hikvision Interactive Displays (including De-install + FREE Collection of Existing Equipment From Site and Package Disposal )
Avoira - Installation & Set Up & User Familiarisation Training
North West AV Installation of 65" Interactive Touch Screen (Includes De-installation)
Crossways YDYW AV Phase 3 (180633)
Workshop or build time for UPS and battery disposal to ISO 14001 Standards
Byond Site Survey For Genting Casino
Teddi install of 4 x 991-000482 and 4 x 991-000423 (8 rooms) - Univar, Bradford - FOB/4294P
Supply and install 1x Newline LYRA Pro 86" (TT-8623QA), 1x 5m cable kit and 1x Newline Lockable wall mount
Full day installation and training
Installation of a data cabinet at five bus stations sites (all located in the west midlands) and 5 network points per site (35 points in total).
Microteam Level 2 Engineer Resource & Packaging Removal Cansfield School
NEC Display Solutions Extended Warranty - Deinstallation / installation - 3 years
King-com Install of Promethean ActivePanel (per screen) - Brackenfield Special School
North West AV - Fully Installed Signage Screen Solution Costs Per Day Per Site For Glasgow, Durham & London
Batton Works As Discussed From Site Survey 10.09.25
Crossways AV Prelims (180634)
Stratford Turing AV Phase 1 (180626)
AV Presentation solution consisting of 4 x 100 inch commercial displays,10 x ceiling speakers, 1 x custom height adjustable lectern with gooseneck microphone and 1 x wearable Lavalier Microphone
Teddi Installation of AV Equipment
Removal of equipment from site by specialist courier.
Delivery and positioning of equipment
Byond Consumables For Site Survey & Install
Avoira-Project Co-ordinator
Installation of large format displays
De-Installation of legacy equipment (Qty 1)
King-com Installation of Meeting Room Technology
North West AV Fully Installed Promethean 65" Screen (Includes De-installation)
Removal of equipment from site by specialist courier.
Kingcom Installation Of Clevertouch PC's To Include Commissioning And Testing To Network
Stratford Turing AV Phase 3 (180628)
MicroTeam Quote MT_1005980 For 3 x Mop Up
North West AV Screen Installation - Northwest - Applicable to 5m cable runs only
Charge per device to install Win 11 23H2
Engineer labour for minor overhaul of UPS
Design, offsite provision and pre-staging, 2 man install team and Audio Visual Commissioning Engineer, Project Management and basic handover.
Wireless Site Survey 1 and 1/2 days (Includes 100 Miles and Documentation)